Loss-limit coordination

PRO-LOSS · basis, at-risk and passive stages in order. English and Spanish.

Free during early access - no account needed. If the workpaper earns its keep, a tip is appreciated.

Loss-limit coordination

One waterfall for one activity: reviewed basis capacity, then at-risk, then the passive allowance, with each suspension kept in its own bucket and reason. A stage result is never a whole-return deductibility conclusion. Numbers never leave this browser.

Complete the earlier steps to see this result.

Verified beta: ordered basis / at-risk / passive waterfall with bucketed suspensions for one activity; rental allowance phaseouts, disposition releases and excess-business-loss / NOL integration route to review and are never assumed. Not a Form 6198, 8582 or whole-return conclusion.

Sources: IRC 465, 469; Pub 925; spec C17.